Still Using Geometric Network After ArcMapRetirement? What Utility Leaders Need to Know

Consider a water utility planning an ArcGIS Enterprise upgrade. During the planning process, the team discovers that its web-based valve isolation tool depends on technology the newer version no longer supports. The upgrade may now require application changes, operational testing, and additional funding that were not part of the original plan.

For CIOs, GIS directors, and operations leaders, this is where continued Geometric Network dependency becomes a wider business concern. A workflow tied to the legacy environment can affect the cost and timing of an infrastructure investment.

What ArcMap retirement means for utilities using Geometric Networks

Esri retired ArcMap on March 1, 2026, ending support for the desktop application many utilities use to edit and maintain their Geometric Networks. That date marks ArcMap’s retirement, not a separate Geometric Network deadline.

Moving those workflows to ArcGIS Pro involves more than replacing desktop software. Geometric Network datasets are read-only in ArcGIS Pro, and custom applications built on ArcObjects for ArcMap do not run directly in ArcGIS Pro. This means network data, editing processes, and dependent applications need to be planned together.

Retirement itself does not make network data inaccurate or automatically disrupt operations. GIS teams can continue working with familiar tools. However, ArcMap no longer receives updates from Esri, even as the operating systems and databases around it keep changing. These limitations become more apparent when the utility needs to upgrade or change the systems those workflows depend on.

When a working tool constrains modernization

Return to the water utility in the opening example. Its valve isolation tool uses a custom ArcObjects server extension to trace the Geometric Network. Staff view the results in a web application to identify which valves to close and which service connections are affected.

When a utility upgrades to ArcGIS Enterprise 11.0 or later, services that depend on older ArcObjects-based extensions may stop working because those extensions are no longer supported. Restoring the map service alone may not restore the tool’s original tracing capability.

The ArcGIS Enterprise SDK, the development framework for supported server extensions, does not support Geometric Networks. The tool’s tracing logic may therefore need to be redesigned for Utility Network rather than simply rebuilt using newer tools.

Before committing to a fix, the GIS director needs to assess whether standard ArcGIS Utility Network tracing can meet the operational requirement or whether custom functionality needs redevelopment. Source-code access, documentation, and developer or vendor availability can affect the effort and timeline.

With that assessment in hand, the CIO can define the upgrade’s scope, funding, and schedule. If the replacement cannot be ready and tested before the planned upgrade, the project needs a revised sequence or an interim process that operations leaders have accepted.

Where utility operations could be affected

Whether an interim process is acceptable depends on the work it has to support. Editing and integration workflows keep records of construction, equipment replacements, and completed fieldwork current for engineering, field crews, and connected systems. When those workflows are interrupted, the effects can reach well beyond GIS.

During a water main break, unavailable tracing or delayed connectivity updates could complicate the response. Crews might need to confirm valve locations and the affected service area through other records or field checks. That verification takes time while the incident is active.

Electric utilities often rely on GIS connectivity in their outage and distribution management systems. If circuit changes are not recorded promptly, operators may need to reconcile discrepancies before a planned switching order moves through review.

Gas utilities can see a similar effect in maintenance planning, where missing asset changes could leave planners reconciling field information with network records before scheduling work.

These are potential consequences of specific workflow interruptions, not outcomes every utility will experience. Operations leaders, working with the GIS director, should identify which scenarios apply to their environment.

What utility leadership needs to evaluate

Operational continuity should come first. A map that still displays does not mean staff can edit the network, run a required trace, or send updates to an asset management system. Operations leaders and the GIS director should identify who relies on each capability, how long they could work without it, and whether the fallback has been tested. A workflow with no workable alternative deserves particular attention.

Planned investments need the same review. An enterprise GIS upgrade, field application replacement, or asset management integration may require changes to legacy interfaces. The CIO should confirm those changes are in the project’s scope before its budget and schedule are finalized.

Alongside that review, the CIO and finance leaders should compare the full cost of maintaining the current environment, including staff time, specialist support, and temporary fixes, with a phased transition. If a new interface would have to be replaced during migration, that second cost belongs in the decision before the first investment is approved.

Then there is knowledge continuity, which the GIS director is best placed to assess. If recovery depends on one employee or an undocumented extension, the director needs to know who else could support it and what access or training they would need.

Security is among the most important requirements to evaluate. Unsupported software can sit alongside systems that hold customer and operational data. The GIS director, IT security lead, and operations leaders should agree on the required interim controls, assign responsibility for each, and establish a schedule for reviewing the remaining risks. Continued use does not by itself mean a security incident or compliance failure, but it calls for a documented risk assessment, a named risk owner, and a review date.

Together, these findings give an executive sponsor, such as the COO or general manager, a clear set of priorities to fund and coordinate.

Planning a transition around operating requirements

Migration planning should start from those assessment findings. The project team can use an inventory of network data, applications, interfaces, and field workflows to define what must be preserved, the security requirements the new environment must meet, and how the transition fits other scheduled infrastructure changes. The inventory should cover the wider ecosystem, including database versions, the ArcGIS Enterprise deployment, plugins, and web applications that still point to older services, so a move to ArcGIS Pro is not funded in isolation.

ArcGIS Utility Network provides a framework for modeling utility assets and connectivity, maintaining network information, and running traces. Utilities can adopt it in more than one way. Esri’s Utility Network Migration Wizard and Migration toolset offer a simpler starting point for organizations with basic editing and tracing requirements, using their existing data and schema as the basis for migration. Utility Network Foundations provide industry-specific models for organizations with more advanced requirements.

Each route has different implications for scope, budget, and timeline, which the CIO and GIS director need to weigh. The decision should follow operating requirements, not an assumption that every utility needs the same implementation.

Once the approach is selected, data preparation, application changes, and testing should be planned together. Operations leaders should involve staff in defining acceptable results using everyday tasks, such as recording an asset replacement, tracing an affected area, or passing an update to a connected system.

Training and cutover should follow operating schedules, with acceptance criteria, recovery arrangements, and support ownership agreed before deployment.

How CyberTech can help address these dependencies

CyberTech works with CIOs, GIS directors, and operations leaders on Geometric Network to Utility Network transitions. By assessing network data, applications, integrations, and operational workflows together, CyberTech helps utilities identify dependencies early and plan modernization around the systems and services they need to maintain. For an enterprise GIS upgrade, that includes identifying tools such as a custom tracing application early enough to account for required changes. CyberTech’s assessments move from discovery and a severity-ranked data readiness report to advice on the appropriate migration path, a pilot on the utility’s own data, and a costed roadmap to support budget approval.

From there, CyberTech supports data preparation, application and integration changes, and testing of the workflows operations teams rely on. After deployment, ongoing GIS support helps maintain the new environment.

As an Esri Platinum Partner with the Network Management Specialty, CyberTech brings experience across network data, applications, and integrations. For managed ArcGIS cloud environments, CyberTech’s DataSafe™ approach addresses security across the user, transit, and server layers.

Understand Your Utility’s Geometric Network Dependencies

Talk to CyberTech about assessing your current environment, identifying critical dependencies, and planning a transition that protects essential utility operations.